t4 blow off valve
They can be and sometimes they are trouble to install.
You want to get either an HKS SQV or a TIAL.
If your Upper IC pipe is made from Aluinum you have an Aluminum flange welded onto it and then the BOV goes ontop and you run a vaccum line to the BOV.
You want to get either an HKS SQV or a TIAL.
If your Upper IC pipe is made from Aluinum you have an Aluminum flange welded onto it and then the BOV goes ontop and you run a vaccum line to the BOV.
Thread
Thread Starter
Forum
Replies
Last Post




